Categories
- ARCHITECTS
- Beyer Blinder Belle
- Carlos Zapata
- Christian de Portzamparc
- Cook + Fox Architects
- Daniel Libeskind
- Diller Scofidio + Renfro
- Foster Associates
- Frank Gehry
- Fumihiko Maki
- FX Fowle Architects
- Gwathmey-Siegel & Associates
- Handel Architects
- Herzog & de Meuron
- HOK Sport
- Jean Nouvel
- Kohn Pedersen Fox
- Lois Kahn
- McKim Mead & White
- Murphy/Jahn Architects
- Pei Cobb Freed
- Polshek Partnership
- Rem Koolhaas
- Richard Rogers
- Robert A. M. Stern
- Santiago Calatrava
- Skidmore, Owings & Merrill
- Tony Morali
- Area
- BUILDINGS
- Contemporary
- 1 Madison Avenue Addition
- 123 Washington Street – W New York Downtown
- 15 Central Park West
- 15 Penn Plaza
- 155 West 57th Street
- 250 East 57th Street
- 3 Columbus Circle
- 30 Park Place
- 330 Madison Avenue
- 400 Park Avenue South
- 50 West Street
- 56 Leonard Street
- 80 South Street
- Atlantic Yards Development
- Beekman Tower
- John Jay College of Criminal Justice Expansion
- Museum for African Art
- New Goldman Sachs Headquarters
- New Mets Stadium (CitiField)
- New Penn Station (Moynihan Station)
- One Madison Park
- Setai Fifth Avenue
- The Bank of America Tower a.k.a. One Bryant Park
- The GiraSole
- Times Square Plaza
- Tower Verre- MOMA's Proposed Expansion
- Trump Place
- Trump SoHo
- United States Mission to U.N.
- Vision Machine
- WTC
- Historic
- Contemporary
- Featured
- SPECIAL
- STYLES
- TYPE
- ARCHITECTS
Category Archives: Modern Amorphic
Recent architectural goings-on about town…
Some good recent stuff. Continue reading
Downtown Skyscraper for the Digital Age
Many New Yorkers have been following the construction of the new residential tower at 8 Spruce Street, just south of City Hall, with a mix of awe and trepidation. Continue reading
Calatrava’s WTC Transit Hub Pared Down
Santiago Calatrava’s design for a transit hub at the World Trade Center site in Manhattan has been scaled back. On July 1, shortly after revealing that virtually all of the construction projects at Ground Zero were behind schedule and over budget, the Port Authority of New York and New Jersey announced it was cutting out a signature element of Calatrava’s elliptical-shaped building: a hydraulic system that would allow its ribbed steel wings to open and close. The operable roof was intended to allow natural light and air into the building. Continue reading
Airy Design For WTC Transit Hub To Be Unveiled
The World Trade Center transit hub will replace the temporary PATH station that opened about two months ago, and it will include an underground concourse that connects a dozen subway lines. The concourse will also extend to the west, connecting to the World Financial Center and ferry terminals. Continue reading
Port Authority awards $86M contract in World Trade Center construction project
Share NEW YORK — The Port Authority took its first concrete step toward construction of Santiago Calatrava’s dramatic World Trade Center PATH and subway hub today, awarding an $86 million contract to a Long Island firm to provide the structure’s concrete floor slabs, beams and walls. Continue reading




